Work Begins

So, I've finally begun ripping the seats out of the bus.  What a delight that is....  I've got all summer and fall to do this build, so I'm pacing myself.  Next couple months should look something like this-

June- Remove seats, flashers, stop sign, and paint with primer, so I can do the title/registration stuff to get it classified as an RV. 

July- Floor, Rough framing for walls and furniture, Install camera system. Run wiring for 12v and 120v circuits. Order tanks, toilet, and other plumbing stuff.

As always, I'll keep you posted.